TSO Wiki.eu

Industrial Gold Mine

Produces gold ore like a level 7 gold mine.

Industrial Gold Mine
Building lot
2×2 on gold deposit
Building licence
Not required
Settler
Required
Tradable
Yes
Movable
No
Construction costs
free
Construction time
5 minutes
Production
  • 7 Gold Deposit
  • 7 Gold Ore
Production time
12 minutes

Available Specialized Production Buffs

Sources

Settings

Settings are saved in your browser's cache.