TSO Wiki.eu

Gold Mine

Produces gold ore from gold deposits. Available from level 24.

Gold Mine Level 7
Building lot
2×2 on gold deposit
Building licence
Required
Settler
Required
Building levels
7
Tradable
No
Movable
No

Building Levels

  1. Level 1

    Gold Mine Level 1
    Construction costs
    • 1400 Hardwood Planks
    • 1400 Marble
    • 1500 Tools
    Construction time
    10 minutes
    Production
    • 1 Gold Deposit
    • 1 Gold Ore
    Production time
    12 minutes
  2. Level 2

    Gold Mine Level 2
    Upgrade costs
    • 500 Tools
    Upgrade time
    2:30 minutes
    Production
    • 2 Gold Deposit
    • 2 Gold Ore
    Production time
    12 minutes
  3. Level 3

    Gold Mine Level 3
    Upgrade costs
    • 1000 Tools
    Upgrade time
    5 minutes
    Production
    • 3 Gold Deposit
    • 3 Gold Ore
    Production time
    12 minutes
  4. Level 4

    Gold Mine Level 4
    Upgrade costs
    • 2000 Tools
    Upgrade time
    7:30 minutes
    Production
    • 4 Gold Deposit
    • 4 Gold Ore
    Production time
    12 minutes
  5. Level 5

    Gold Mine Level 5
    Upgrade costs
    • 5000 Tools
    Upgrade time
    10 minutes
    Production
    • 5 Gold Deposit
    • 5 Gold Ore
    Production time
    12 minutes
  6. Level 6

    Gold Mine Level 6
    Upgrade costs
    • 200 Grout
    Upgrade time
    10 minutes
    Production
    • 6 Gold Deposit
    • 6 Gold Ore
    Production time
    12 minutes
  7. Level 7

    Gold Mine Level 7
    Upgrade costs
    • 3000 Advanced Tools
    Upgrade time
    13:20 minutes
    Production
    • 7 Gold Deposit
    • 7 Gold Ore
    Production time
    12 minutes

Available Specialized Production Buffs

Settings

Settings are saved in your browser's cache.