TSO Wiki.eu

Gold Mine

Gold Mine Level 7

Produces gold ore from gold deposits. Available from level 24.

Building lot
2×2 on gold deposit
Building licence
Required
Settler
Required
Building levels
7
Tradable
No
Movable
No

Building Levels

  1. Level 1

    Gold Mine Level 1
    Construction costs
    • 1400 Hardwood Planks
    • 1400 Marble
    • 1500 Tools
    Construction time
    10 minutes
    Production
    • 1 Gold Deposit
    • 1 Gold Ore
    Production time
    12 minutes
  2. Level 2

    Gold Mine Level 2
    Upgrade costs
    • 500 Tools
    Upgrade time
    2:30 minutes
    Production
    • 2 Gold Deposit
    • 2 Gold Ore
    Production time
    12 minutes
  3. Level 3

    Gold Mine Level 3
    Upgrade costs
    • 1000 Tools
    Upgrade time
    5 minutes
    Production
    • 3 Gold Deposit
    • 3 Gold Ore
    Production time
    12 minutes
  4. Level 4

    Gold Mine Level 4
    Upgrade costs
    • 2000 Tools
    Upgrade time
    7:30 minutes
    Production
    • 4 Gold Deposit
    • 4 Gold Ore
    Production time
    12 minutes
  5. Level 5

    Gold Mine Level 5
    Upgrade costs
    • 5000 Tools
    Upgrade time
    10 minutes
    Production
    • 5 Gold Deposit
    • 5 Gold Ore
    Production time
    12 minutes
  6. Level 6

    Gold Mine Level 6
    Upgrade costs
    • 200 Grout
    Upgrade time
    10 minutes
    Production
    • 6 Gold Deposit
    • 6 Gold Ore
    Production time
    12 minutes
  7. Level 7

    Gold Mine Level 7
    Upgrade costs
    • 3000 Advanced Tools
    Upgrade time
    13:20 minutes
    Production
    • 7 Gold Deposit
    • 7 Gold Ore
    Production time
    12 minutes

Available Specialized Production Buffs

Settings

Settings are saved in your browser's cache.

Used to automatically display the content that matches your level in the game.