TSO Wiki.eu

Endless Gold Mine

Endless Gold Mine Level 7

Produces an endless amount of gold ore and never depletes!

Building lot
2×2 on gold deposit
Building licence
Not required
Settler
Required
Building levels
7
Tradable
No
Movable
No

Building Levels

  1. Level 1

    Endless Gold Mine Level 1
    Construction costs
    free
    Construction time
    40 seconds
    Production
    • 2 Gold Ore
    Production time
    9:36 minutes
  2. Level 2

    Endless Gold Mine Level 2
    Upgrade costs
    • 750 Hardwood Planks
    • 700 Marble
    Upgrade time
    2:30 minutes
    Production
    • 3 Gold Ore
    Production time
    9:36 minutes
  3. Level 3

    Endless Gold Mine Level 3
    Upgrade costs
    • 300 Coins
    • 800 Marble
    Upgrade time
    1 hour
    Production
    • 4 Gold Ore
    Production time
    9:36 minutes
  4. Level 4

    Endless Gold Mine Level 4
    Upgrade costs
    • 700 Coins
    • 2000 Marble
    Upgrade time
    1 day
    Production
    • 5 Gold Ore
    Production time
    9:36 minutes
  5. Level 5

    Endless Gold Mine Level 5
    Upgrade costs
    • 1200 Exotic Wood Planks
    • 2000 Granite
    Upgrade time
    7 days
    Production
    • 6 Gold Ore
    Production time
    9:36 minutes
  6. Level 6

    Endless Gold Mine Level 6
    Upgrade costs
    • 1000 Grout
    • 5000 Granite
    Upgrade time
    7 days
    Production
    • 7 Gold Ore
    Production time
    9:36 minutes
  7. Level 7

    Endless Gold Mine Level 7
    Upgrade costs
    • 6000 Advanced Tools
    • 8000 Oil
    Upgrade time
    10 days
    Production
    • 8 Gold Ore
    Production time
    9:36 minutes

Available Specialized Production Buffs

Sources

Settings

Settings are saved in your browser's cache.

Used to automatically display the content that matches your level in the game.